
Archive for June, 2018
18 June 2018
6 weeks in – 35% built
Our builder Julie and his team are doing a great job. Windows are in on the school building and the toilet block is well underway as well. Check out the Timorese scaffolding!

project: Belola School

04 June 2018
Belola School is 20% Built
The walls are going up and the window frames are being installed. Everything is going to plan and Belola School is looking great!


|